Skip to main content

Setpoint Integrated Solutions wins Cameron LNG valve contract

LNG Industry,


Setpoint Integrated Solutions (Setpoint I.S.), an industrial supplier of engineered process control solutions, has announced that it is has been selected by Cameron LNG, a large liquefied natural gas terminal located in the state of Louisiana, to supply of all of its control, safety relief and automated isolation valves.

Engaging in the selection, sourcing and therefore providing the majority of the automated on-off valves, control valves and safety relief valves, Setpoint I.S. will execute its workflow process that optimises each project’s timeline and cost by being. Joey Jobe, Chairman of Setpoint I.S. commented: “We’ve created an efficient and transparent workflow process to provide turnkey solutions stemming from our manufacturer relationships and robust application engineering integrated with life cycle cost considerations to provide the best result for all the parties involved.”

Setpoint I.S.’ application experts, the OEM manufacturers and the engineering contractor will work side-by-side to engineer, size, specify, assemble and provide thorough documentation packages for execution. “We focus our efforts on providing not just integrated process solutions, but long-term partnerships with our clients,” said David Ross, Vice President of Supply Chain and director of this project, also adding: “Setpoint’s EPC Workflow Process offers added value in optimizing cost savings and minimizing risks for both the end user and EPC.”

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/15062015/setpoint-wins-cameron-contract/

You might also like

 
 

Embed article link: (copy the HTML code below):