GTT to build tanks for two new LNG carriers
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Samsung Heavy Industries (SHI), concerning the tank design of two 180 000 m3 LNG carriers, on behalf of ship-owner Celsius Tankers.
GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system, a technology developed by GTT. The deliveries of the ships are planned during 2Q21.
Philippe Berterottière, Chairman and CEO of GTT, declared: “We are very pleased to receive this new order from SHI, which confirms Celsius Tankers’ entry into the LNG industry, whom we are pleased to accompany, once more, with our technology.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/13032019/gtt-to-build-tanks-for-two-new-lng-carriers/
You might also like
Measuring the LNG process with confidence
At every stage of the LNG process – from pretreatment to transportation – accurate and reliable measurements are essential for optimising production, maintaining safety, and ensuring profitability.