TeamTec to retrofit BWM systems on Höegh LNG carriers
Published by Will Owen,
Editor
LNG Industry,
TeamTec has been awarded a contract to supply its TeamTec Oceansaver Ballast Water Management System (TTO BWMS) for two of Höegh LNG’s gas carriers. The vessels to be retrofitted are Artic Princess and Arctic Lady, and installation will take place in 2020.
The TTO BWMS delivers high-performance filtration in combination with disinfection through patented electrodialysis. It was the first electro chlorination BWMS to receive USCG type approval and has recently been approved according to the new IMO BWM Code (revised G8). Höegh LNG and the carriers’ charterer, Equinor, jointly selected the TTO BWMS, citing the strong focus on safety as one of the main reasons.
The TTO BWMS fits perfectly to suit the high capacity ballast flows that are used in LNG carriers. An intelligent chemical dosing algorithm optimises power consumption during ballast operations resulting in minimal consumable usage during de-ballast.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/11052020/teamtec-to-retrofit-bwm-systems-on-hoegh-lng-carriers/
You might also like
QatarEnergy signs new LNG shipbuilding agreement with HD Hyundai Heavy Industries
QatarEnergy has signed an agreement with HD Hyundai Heavy Industries for the construction of 17 ultra-modern LNG carriers.