Skip to main content

GTT receives LNG carrier tank design order from DSME

Published by , Editor
LNG Industry,


GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) concerning the tank design of a new 174 000 m3 LNG carrier on behalf of a European ship-owner.

GTT’s membrane containment system NO96 GW has been selected for the design of the tanks and the delivery of the ship is planned for early 2022.

Philippe Berterottière, Chairman and CEO of GTT, commented: “We are very pleased to continue our partnership of excellence with DSME with this new order.”

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/09012020/gtt-receives-lng-carrier-tank-design-order-from-dsme/

You might also like

Securing LNG’s leading role on the global energy stage

In our recent April issue of LNG Industry, Michael Pospisil P.E., Senior Engineer, and Rich Insull, P.E., Project Manager, Matrix PDM Engineering, detail the significance of life cycle analysis to helping secure LNG’s role in the future energy mix.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG carrier news