GTT receives LNG carrier tank design order from DSME
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) concerning the tank design of a new 174 000 m3 LNG carrier on behalf of a European ship-owner.
GTT’s membrane containment system NO96 GW has been selected for the design of the tanks and the delivery of the ship is planned for early 2022.
Philippe Berterottière, Chairman and CEO of GTT, commented: “We are very pleased to continue our partnership of excellence with DSME with this new order.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/09012020/gtt-receives-lng-carrier-tank-design-order-from-dsme/
You might also like
MET Group expands into Asia-Pacific
MET Group has opened its office in the Republic of Singapore.