Bechtel on increasing productivity and constructability in LNG projects
Published by Will Owen,
Editor
LNG Industry,
Gastech Insights spoke with Bruce Barnes, LNG Technology Manager at Bechtel at Gastech’s Governing Body Meeting back in March to hear more about EPC’s and how they are utilising innovation to adapt to the new evolving markets.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/02082019/bechtel-on-increasing-productivity-and-constructability-in-lng-projects/
You might also like
Crown LNG selects IKM Consulting Ltd as engineering design partner for Grangemouth LNG project
Crown LNG Holdings Ltd has selected IKM Engineering & Environmental Consultants as its partner for the design and engineering of its planned 100% owned floating LNG import terminal in the Firth of Forth, Scotland.