DSME place LNG tank design order with GTT
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) concerning the tank design of four new 174 000 m3 LNG carriers on behalf of the Greek ship-owner Maran Gas.
The delivery of the vessels is planned between end of 2021 and early 2022.
Philippe Berterottière, Chairman and CEO of GTT commented: “We are very pleased to continue our partnership of excellence with DSME and Maran Gas with this considerable new order.”
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/02072019/dsme-place-lng-tank-design-order-with-gtt/
You might also like
Air Products announces LNG process technology performance test for Coral South FLNG
Air Products has announced its dual mixed refrigerant LNG Process technology and equipment, which has been deployed at the Coral South floating LNG plant in Mozambique, has successfully passed its performance test, achieving LNG production above 3.4 million tpy.