Skip to main content

KN provides notice of its LNG terminal capacity allocation

Published by , Editor
LNG Industry,


AB Klaipedos Nafta (KN) has announced that its LNG terminal capacity have been allocated.

The conditions of the capacity allocations are indicated below:

  • LNG regasification capacity: 999.970.000 kWh (with reference conditions: natural gas upper heating value – 11.90 kWh/nm3, LNG expansion coefficient - 1:578 (m3 LNG/nm3 natural gas), combustion/measurement temperature -25/0°C, pressure – 1.01325 bar).
  • LNG regasification period: from 1 May 2020 until 31 May 2020.

KN constantly provides updates regarding available capacities at its LNG terminal on its website. Unallocated capacities are made available for booking throughout the gas year.

Read the article online at: https://www.lngindustry.com/liquid-natural-gas/02032020/kn-provides-notice-of-its-lng-terminal-capacity-allocation/

You might also like

NextDecade provides updates for Rio Grande Train 4 and 5

NextDecade Corp. has finalised an EPC pricing contract refresh with for Train 4 and executed an EPC contract for the construction of Train 5 and related infrastructure with Bechtel Energy Inc. at the Rio Grande LNG facility.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

LNG project news LNG import news Current LNG projects