Skip to main content

Chevron starts production at Gorgon Train Three LNG project

Published by , Editor
LNG Industry,


Reuters are reporting that Chevron has started production of LNG from the third of three production units at the Gorgon LNG project in Australia.

Chevron is the operator of the US$54 billion project that has a total of three production trains with a combined capacity of 15.6 million tpy of production capacity.

First production of the supercooled fuel from Gorgon began in March last year. 

Read the article online at: https://www.lngindustry.com/liquefaction/28032017/chevron-starts-production-at-gorgon-train-three-lng-project/

You might also like

Downer awarded contract by Chevron

Downer EDI Ltd has been awarded a contract by Chevron Australia Pty Ltd for the provision of maintenance and support services over a maximum term of 15 years.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Australia LNG news


 

LNG Industry is not responsible for the content of external internet sites.