Pluto LNG production shut-in
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
Woodside has announced that it has temporarily shut-in production at its Pluto LNG Plant.
The precautionary action was taken after a submersible drilling rig under contract to another party drifted near Pluto flowlines.
Underwater inspections have confirmed the integrity of the flowlines. Production will be restarted when the rig has been relocated away from Pluto LNG infrastructure.
Woodside expects to advise on the recommencement of production in due course.
Edited from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/liquefaction/16032015/pluto-lng-production-shut-in-419/
You might also like
EIA: US natural gas trade will continue to grow with the start-up of new LNG export projects
The U.S. Energy Information Administration’s recently released Short-Term Energy Outlook forecasts that US LNG exports will continue to lead growth in US natural gas trade as three LNG export projects currently under construction start operations and ramp up to full production by the end of 2025.