Skip to main content

Pluto LNG production shut-in

Published by , Senior Editor
LNG Industry,


Woodside has announced that it has temporarily shut-in production at its Pluto LNG Plant.

The precautionary action was taken after a submersible drilling rig under contract to another party drifted near Pluto flowlines.

Underwater inspections have confirmed the integrity of the flowlines. Production will be restarted when the rig has been relocated away from Pluto LNG infrastructure.

Woodside expects to advise on the recommencement of production in due course.


Edited from press release by

Read the article online at: https://www.lngindustry.com/liquefaction/16032015/pluto-lng-production-shut-in-419/

You might also like

JERA signs MoU with KOGAS

JERA Co., Inc. has signed a memorandum of understanding with Korea Gas Corp. with the aim of strengthening energy security in Japan and the Republic of Korea.

 
 

Embed article link: (copy the HTML code below):