Pluto LNG production shut-in
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
Woodside has announced that it has temporarily shut-in production at its Pluto LNG Plant.
The precautionary action was taken after a submersible drilling rig under contract to another party drifted near Pluto flowlines.
Underwater inspections have confirmed the integrity of the flowlines. Production will be restarted when the rig has been relocated away from Pluto LNG infrastructure.
Woodside expects to advise on the recommencement of production in due course.
Edited from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/liquefaction/16032015/pluto-lng-production-shut-in-419/
You might also like
JGC-Hyundai joint venture considered as EPC contractor for LNG project in Papua New Guinea
JGC Corp. and Hyundai Engineering & Construction Co., Ltd have been selected as the EPC contractor for a major low carbon LNG plant as part of the Papua LNG project planned by TotalEnergies and its venture partners in Papua New Guinea.
