Skip to main content

Yamal LNG ships second millionth ton of LNG

Published by
LNG Industry,


OAO Yamal LNG has shipped the second millionth ton of LNG produced at its first LNG train.

Yamal LNG commenced shipments from December 2017 utilising Arc7 ice class carriers each holding 170 000 m3, or approximately 74 000 t of LNG. Yamal LNG reached the second millionth ton shipped on the 27th cargo loaded and dispatched at the Sabetta seaport from the first LNG train.

LNG deliveries under long-term contracts started in April 2018, with four LNG cargos already shipped under such commitments.

In April, the first firing of compressor gas turbines was performed at the second LNG train comprising 5.5 million tpy, which represents one of the key milestones in the preparation of the train’s upcoming launch.

Read the article online at: https://www.lngindustry.com/liquefaction/09052018/yamal-lng-ships-second-million-ton-of-lng/

You might also like

 STATS Group

[WEBINAR] Digital Shipbuilding: A Transparent and Real-Time View of the Fabrication Process is Possible

In this webinar, Ismo Piirainen and David Whittle of Hexagon PPM will be discussing the digitalisation and digital transformation trends driving Industry 4.0, especially when it comes to fabrication. Register for free today »

 
 
 

Embed article link: (copy the HTML code below):