Skip to main content

FERC approves Gulf South Pipeline’s pre-filing request

LNG Industry,


The US Federal Energy Regulatory Commission (FERC) has approved Gulf South Pipeline’s request to commence the pre-filing environmental review of its proposed Coastal Bend Header Project.

The project consists of the construction of approximately 65 miles of 36-in. diameter pipeline, interconnecting Tennessee Gas Pipeline Company’s system in Wharton County, Texas, with the Freeport LNG terminal in Brazoria County, Texas.

The project will provided approximately 1.54 billion ft3/d of gas to serve the Freeport LNG liquefaction terminal, and will include two new compressor stations, as well as modifications at two existing compressor stations.

Gulf South intends to file an application no later than 12 June 2015.


Edited from various sources by Katie Woodward

Read the article online at: https://www.lngindustry.com/liquefaction/07112014/gulf-south-pipeline-to-commence-pre-filing-review-1747/

You might also like

INOXCVA's mini LNG terminals: A modular, scalable, reliable, safe, and cost-efficient LNG distribution solution for remote locations and islands.

INOXCVA’s mini LNG terminals offer a modular, scalable, and cost-efficient solution for delivering clean energy to remote regions and islands. With rapid deployment, low CAPEX, and multi-sector utility, they enable LNG-based power, industrial fuel, and mobility where traditional infrastructure is unviable – bridging the last-mile gap in energy access.

 
 

Embed article link: (copy the HTML code below):