Klaipeda LNG terminal receives 50th cargo
Published by Joseph Green,
Editor
LNG Industry,
On 25 May the 50th LNG reloading operation took place at the LNG terminal operated by KN (AB Klaipedos Nafta).
The 50th load was delivered to the Klaipeda port by the Arctic Voyager. The LNG carrier brought 140 000 m3 of LNG from a liquefaction plant in Norway.
Since October 2014, when the FSRU Independence began operations in Klaipeda, the terminal has received 42 LNG imports totalling 5.4 million m3 of LNG.
The average size of one load is 139 000 m3 of LNG, while the largest shipment was delivered to Klaipeda terminal by the Valencia Knutsen, which has a capacity of 173 000 m3.
Gas has been supplied to Lithuania from four countries: Norway, the United States, Trinidad and Tobago, and Nigeria.
Read the article online at: https://www.lngindustry.com/floating-lng/29052018/klaipeda-lng-terminal-receives-50th-cargo/
You might also like
Harvest Alaska and Chugach Electric Association plan to redevelop Kenai LNG terminal
Harvest Alaska and Chugach Electric Association plan to strengthen Southcentral gas supplies through redevelopment of Kenai Peninsula LNG terminal.