GTT to design FSRU for MOL
Published by Will Owen,
Editor
LNG Industry,
GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the design of a new floating storage and regasification unit (FSRU) on behalf of the Japanese ship-owner Mitsui OSK Lines Ltd. (MOL).
The FSRU with a capacity of 263 000 m3 will be fitted with the NO96 membrane cryogenic containment system, a technology developed by GTT. The vessel delivery is scheduled in 2023. It will be located in Wilhelmshaven, Germany.
Philippe Berterottière, Chairman and CEO of GTT, said: “We are delighted to be working with DSME and MOL, two very long-term partners, on this new very large capacity FSRU project.”
Read the article online at: https://www.lngindustry.com/floating-lng/10062020/gtt-to-design-fsru-for-mol/
You might also like
GNLink launches liquefaction unit in Brazil
GNLink has received authorisation from the National Agency of Petroleum, Natural Gas, and Biofuels to start the operation of its first natural gas liquefaction unit in the Northeast.