Skip to main content

PFLNG Satu arrives at destination

Published by , Senior Editor
LNG Industry,


Petronas has announced that its floating LNG (FLNG) vessel, PFLNG Satu (PFLNG1), arrived at the Kanowit gas field, offshore Sarawak, on 30 May 2016.

PFLNG Satu set sail on 14 May 2016, and has since traveled 2120 nautical miles to reach its destination.

The PFLNG SATU, which has a processing capacity of 1.2 million tpy, was towed from the Daewoo Shipbuilding & Marine Engineering Co. Ltd (DSME) shipyard in Okpo, South Korea for the offshore phase of the project.

The installation, hook-up and commissioning of the floating facility was expected to proceed once it has been moored at the Kanowit gas field.

Edited by

Read the article online at: https://www.lngindustry.com/floating-lng/10062016/pflng-satu-arrives-at-destination-2585/

You might also like


 

 The LNG Industry Podcast

A podcast series for professionals in the LNG industry featuring short, insightful interviews. Subscribe on your favourite podcast app to start listening today.

Apple Podcasts  Spotify Podcasts  YouTube

 

 
 

Embed article link: (copy the HTML code below):