Skip to main content

PFLNG Satu arrives at destination

Published by , Senior Editor
LNG Industry,


Petronas has announced that its floating LNG (FLNG) vessel, PFLNG Satu (PFLNG1), arrived at the Kanowit gas field, offshore Sarawak, on 30 May 2016.

PFLNG Satu set sail on 14 May 2016, and has since traveled 2120 nautical miles to reach its destination.

The PFLNG SATU, which has a processing capacity of 1.2 million tpy, was towed from the Daewoo Shipbuilding & Marine Engineering Co. Ltd (DSME) shipyard in Okpo, South Korea for the offshore phase of the project.

The installation, hook-up and commissioning of the floating facility was expected to proceed once it has been moored at the Kanowit gas field.

Edited by

Read the article online at: https://www.lngindustry.com/floating-lng/10062016/pflng-satu-arrives-at-destination-2585/

You might also like

Glenfarne’s Texas LNG signs HOA with EQT

Texas Brownsville LLC has signed a Heads of Agreemnt with EQT Corporation for natural gas liquefaction services for an additional 1.5 million tpy of LNG over 20 years.

 
 

Embed article link: (copy the HTML code below):