Current LNG projects
Santos upgrades 2025 production target
Santos has lifted its 2025 production target to 120 million boe, more than double 2018’s output.
McDermott and Chiyoda introduce feed gas to Cameron LNG 2
McDermott International and Chiyoda International Corp. have announced that Train 2 of the Cameron project has reached the final commissioning stage.
Yamal LNG ships first LNG cargo to Bangladesh
Yamal LNG has shipped its first cargo of LNG to Bangladesh, in accordance with its long-term offtake agreement with Total.
PGNiG enters small scale LNG market in Lithuania
For a period of five years, Polish Oil and Gas Company (PGNiG) will be the sole user of the small scale LNG reloading station in Klaipeda.
PETRONAS names its second floating LNG facility
PETRONAS has officially named its second FLNG facility: ‘PFLNG DUA’.
The first two jackets for Qatar Petroleum’s NFE project have been fabricated
Qatar Petroleum has announced the load out of the first two jackets for its North Field Expansion project.
Golar LNG releases latest interim results
Golar LNG has releases its interim results for the period ended 30 September 2019.
Magnolia LNG EPC contract extended
LNG Limited has extended the validity period of its current binding EPC contract with KSJV for its subsidiary, Magnolia LNG LLC.
Qatar’s LNG capacity to hit 126 million by 2027
According to Qatar Petroleum’s chief executive Saad al-Kaabi, Qatar’s LNG production capacity will be expanded to 126 million tpy by 2027.
Elengy and Rubis Terminal to build LNG storage facility in Alsace
Elengy and Rubis Terminal have signed an MOU to launch preliminary studies for the development of an LNG storage facility at the Reichstett (Bas-Rhin) storage terminal.