GTT receives LNG tank order from CPECCNC
GTT has received an order from CPECCNC for the design of a 29 000 m3 membrane full containment LNG tank.
GTT has received an order from CPECCNC for the design of a 29 000 m3 membrane full containment LNG tank.
Jane K.G. Kristiansen and Tonje Sunde, Connect LNG, Norway, explore the import infrastructure available along South Africa’s coastline and how improvements can be made to strengthen the country’s energy industry.