Video: working on Dunkirk LNG terminal
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
Micaela Piras, Civil Engineer, Techint Engineering and Construction, talks about her experience, which has led her to be a Mechanical Quantity Surveyor at the Dunkirk LNG Terminal construction site.
Ms Piras explains that flexibility, determination and precision are essential elements for her job.
The Dunkirk LNG terminal will have an annual regasification capacity of 13 billion m3 of gas.
As an LNG regasification infrastructure, the Dunkerque LNG terminal will be able to accommodate the world's largest LNG tankers in France, at the western outer harbour.
Edited by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/regasification/10022015/video-working-on-dunkirk-lng-terminal-145/
You might also like
IEEFA: EU combined gas and LNG imports fall due to reduced demand
EU measures to reduce gas demand have driven a decline in the bloc’s combined imports of pipeline gas and LNG, according to a new data tracking tool published by the Institute for Energy Economics and Financial Analysis.