GTT wins LNG carrier order from DSME
GTT has received an order for four large LNG carriers, to be built by the Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME).
The four LNG carriers for Maran Gas are expected to be delivered between 2017 and 2019 and will be built using NO96-GW technology, which allows an optimised boil-off rate of cargo LNG.
Philippe Berterottière, Chairman and CEO of GTT, commented: "We are very pleased that these new buildings for Maran Gas integrate GTT membrane technology. This order also reinforces our good relationship with DSME, a long term partner."
Adapted from press release by Katie Woodward
Read the article online at: https://www.lngindustry.com/lng-shipping/26012015/gtt-nets-lng-order-from-dsme-108/
You might also like
IEEFA: Tidal wave of new LNG supply to flood market amid demand uncertainty
Sluggish demand growth for LNG, combined with a record increase in global export capacity through 2028, will likely thrust markets into an extended period of oversupply, according to the latest Global LNG Outlook from the Institute for Energy Economics and Financial Analysis.