PitPoint LNG bunker station tank filled for first time
Published by Will Owen,
Editor
LNG Industry,
PitPoint’s LNG bunker station tank (200 m3 capacity) has been successfully filled with LNG for the first time by its partner Prima LNG.
The bunker station is currently being constructed along the busiest waterway in Europe, the Rhine, in the port of Cologne (Am Molenkopf 17). It marks an important step towards making LNG available for inland shipping as a clean fuel option.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/21082019/pitpoint-lng-bunker-station-tank-filled-for-first-time/
You might also like
NextDecade provides updates for Rio Grande Train 4 and 5
NextDecade Corp. has finalised an EPC pricing contract refresh with for Train 4 and executed an EPC contract for the construction of Train 5 and related infrastructure with Bechtel Energy Inc. at the Rio Grande LNG facility.