Equinor’s Melkoeya LNG plant restart delayed
The restart of Equinor’s Melkoeya LNG plant has been delayed due to a gas leak being detected during restart preparations.
The restart of Equinor’s Melkoeya LNG plant has been delayed due to a gas leak being detected during restart preparations.
The Zeebrugge LNG terminal has widened its destination flexibility by loading LNG for rail transport.
2020’s Gastech Virtual Summit has been credited with putting the spotlight on the importance of gas in the growing demand for energy globally and highlighted the resilience of the industry.
Bureau Veritas has awarded an AIP to Hyundai Heavy Industries for its floating LNG power solution.