GTT receives two new orders from Hyundai Heavy Industries
Published by Will Owen,
Editor
LNG Industry,
GTT has received two orders from the Korean shipyard Hyundai Heavy Industries (HHI), each concerning the tank design of a new LNG carrier.
One of the orders is on behalf of the ship-owner Tsakos, and the other on behalf of Capital Gas Carriers.
Each unit will offer a capacity of 174 000 m3.
GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system.
The delivery of the ships is planned during 4Q21.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/12092019/gtt-receives-two-new-orders-from-hyundai-heavy-industries/
You might also like
Woodside and PETRONAS eye long-term LNG supply
Woodside Energy and PETRONAS, through its subsidiary PETRONAS LNG Ltd, have signed a non-binding heads of agreement for the supply of 1 million tpy of LNG to Malaysia from 2028 for a period of 15 years.