GTT receives LNG tank order from Korean shipyard
Published by Will Owen,
Editor
LNG Industry,
GTT has received a new order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier (LNGC), to be built on behalf of a European ship-owner.
The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT. The vessel’s delivery is expected during 2H 2020.
For confidentiality purposes, the names of the contracting parties of the project cannot be disclosed at this time.
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/05092018/gtt-receives-lng-tank-order-from-korean-shipyard/
You might also like
Trafigura signs long-term LNG supply agreement with KOGAS
Trafigura has signed a long-term agreement to supply LNG to Korea Gas Corporation.