GTT receives LNG carrier order
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
Gaztransport and Technigaz (GTT) has received a new order for an LNG carrier.
South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME) will build the LNG carrier for the Greek shipowner Chandris.
The LNG carrier will be built with the innovative NO96-GW technology, which allows an optimised boil-off rate of cargo LNG.
The carrier is expected to be delivered in 2018.
Adapted from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/liquid-natural-gas/04022015/gtt-receives-lng-carrier-order-from-dsme-174/
You might also like
Tellurian reports 1Q24 results and Driftwood LNG progress
Tellurian Inc. has continued making progress on Driftwood LNG phase one construction with Bechtel.