Dynapumps supplies Wheatstone LNG plant
Dynapumps recently completed the supply of one of its LNG fire water pump packages for the Wheatstone LNG plant, currently under construction in Western Australia.
Dynapumps supplied three packages. The first consisted of three diesel pump sets, two fitted with jockey pumps, 800 L double skinned fuel tanks and a cooling loop fitted for engine heat exchangers.
The second fire water pump package contained one electric pump set with jockey pump, two diesel pump sets both with 800 L double skinned fuel tanks one with jockey pump and one without. A cooling loop was fitted for engine heat exchangers.
The third package contained two diesel engine systems both fitted with acoustic enclosures to ensure sound levels stay below 85dBA as required, one electric system and one dual jockey pump system with controller and piping.
Adapted from press release by Ted Monroe
Read the article online at: https://www.lngindustry.com/liquefaction/11082014/dynapumps-supplied-wheatstone-lng-plant-with-fire-water-pump-packages-1182/
You might also like
IEEFA: Tidal wave of new LNG supply to flood market amid demand uncertainty
Sluggish demand growth for LNG, combined with a record increase in global export capacity through 2028, will likely thrust markets into an extended period of oversupply, according to the latest Global LNG Outlook from the Institute for Energy Economics and Financial Analysis.