GE to supply compressors for Petronas LNG project
GE Oil & Gas has won the contract to supply turbocompression technology for the Petronas LNG Train 9 project, which will add 3.6 million tpy to the existing 25.7 million tpy production capacity of the Petronas LNG Complex in Bintulu, Sarawak, Malaysia.
Under a contract worth approximately US$ 150 million, GE is providing a fully integrated solution for Train 9, including GE Oil & Gas turbocompression equipment and variable speed drive systems from GE’s Power Conversion business. The scope of GE’s supply includes a low/medium-pressure mixed refrigerant package and a propane and high pressure-mixed refrigerant package, each driven by a Frame 7EA gas turbine with a 13-megawatt induction motor running at 3600 rpm and VSI technology variable speed drive systems.
The compression trains are vital elements of the liquefaction process, which cools natural gas to a liquid state.
Adapted from press release by Peter Farrell.
Read the article online at: https://www.lngindustry.com/liquefaction/06062012/ge-to-supply-compressors-for-petronas-lng-project11/
You might also like
Caturus authorises full purchase orders for Commonwealth LNG
Caturus has authorised full purchase orders for major equipment in anticipation of final investment decision for the Commonwealth LNG export facility in Louisiana, the US.