SHI receives FSRU order
Published by Joseph Green,
Editor
LNG Industry,
Samsung Heavy Industries Company has won an order to build a Floating Storage and Regasification Unit (FSRU) for approximately KRW 250 billion.
Samsung Heavy Industries Company has won an order to build a Floating Storage and Regasification Unit (FSRU) for approximately KRW 250 billion.
SHI revealed on 19 October a newbuild order for a 170 000? FSRU received from a consortium of Marubeni, Sojitz, and Pertamina.
The latest FSRU from SHI will be equipped with Samsung's newly developed in-house regasification system, the S-Regas(GI).
S-Regas (GI) reduces the chance of corrosion from traditional methods of heating LNG directly with seawater, and is another energy efficient solution from SHI saving energy by 5%.
SHI showcased the system in September to 19 ship-owner companies.
Read the article online at: https://www.lngindustry.com/floating-lng/19102017/shi-receives-fsru-order/
You might also like
Port Canaveral completes bunkering for world’s largest cruise ship
Royal Caribbean International’s Star of the Seas has been refuelled with LNG for the first time at Port Canaveral.