Klaipedos Nafta announces September 2015 regas figures
Published by Callum O'Reilly,
Senior Editor
LNG Industry,
SC Klaipedos Nafta has announced that its LNG terminal regasified 320 000 MWh of LNG in September 2015. The regasified gas was supplied to Lithuania’s natural gas transmission system.
The preliminary sales revenues of the company’s LNG terminal for September 2015 stood at €5.4 million.
In August, the LNG terminal regasified 394 000 MWh of LNG, generating a preliminary sales revenue of €5.4 million.
Edited from press release by Callum O'Reilly
Read the article online at: https://www.lngindustry.com/regasification/06102015/klaipedos-nafta-announces-september-2015-regas-figures-1413/
You might also like
JGC-Hyundai joint venture considered as EPC contractor for LNG project in Papua New Guinea
JGC Corp. and Hyundai Engineering & Construction Co., Ltd have been selected as the EPC contractor for a major low carbon LNG plant as part of the Papua LNG project planned by TotalEnergies and its venture partners in Papua New Guinea.
