GTT Energy, the group's operational unit dedicated to energy containment and management systems, has received, in 4Q26, an order from the Hudong-Zhonghua Shipbuilding shipyard for the design of the tanks of five new LNG carriers on behalf of the shipowner MISC.
GTT will design the cryogenic tanks for these ships, each offering a total capacity of 174 000 m3. The tanks will be equipped with the NO96 Super+ membrane containment system developed by GTT.
The ships are scheduled to be delivered between 1Q29 – 3Q30.




