LNG carrier on order from MOL gets GTT technology
GTT has announced a new order for one LNG carrier.
This new ship will be built by South Korean shipbuilder, Daewoo Shipbuilding & Marine Engineering (DSME).
The LNG carrier, for Mitsui OSK Lines (MOL), is expected to be delivered in 2018.
The ship will be built with GTT’s NO96-GW technology, which allows an optimised boil-off rate of cargo LNG.
Adapted from press release by Katie Woodward
Read the article online at: https://www.lngindustry.com/lng-shipping/12032015/gtt-wins-lng-carrier-order-for-mol-405/
You might also like
NextDecade provides updates for Rio Grande Train 4 and 5
NextDecade Corp. has finalised an EPC pricing contract refresh with for Train 4 and executed an EPC contract for the construction of Train 5 and related infrastructure with Bechtel Energy Inc. at the Rio Grande LNG facility.