ClassNK issues AiP for GTT’s LNG fuel tank design
GTT have designed a LNG fuel tank with 2 bar gauge design pressure, which offers improved pressure holding capabilities and operational flexibility, especially during bunkering operations.
GTT have designed a LNG fuel tank with 2 bar gauge design pressure, which offers improved pressure holding capabilities and operational flexibility, especially during bunkering operations.
Project Colibri is a backfill project that is expected to add approximately 30 000 boe/d of sustained near-term gas production, with peak production at approximately 43 000 boe/d.