The LNG carrier, ’Kool Baltic’, arrived at the terminal managed by LNG Croatia on 17 November 2022.
All safety checks are underway, after which the cargo transfer operation from the LNG carrier to the FSRU vessel ‘LNG Croatia’ will begin.
LNG carrier ’Kool Baltic’ was due to leave the terminal and special purpose port area on the morning of 18 November 2022.