GTT has received, in 1Q26, an order from the shipyard Samsung Heavy Industries for the tank design of one new LNG carrier on behalf of a European shipowner.
GTT will design the cryogenic tanks of the vessel, which will provide a total capacity of 180 000 m3. The tanks will be fitted with GTT’s Mark III Flex membrane containment system.
Delivery of the vessel is expected in 2028.