Skip to main content

GTT receives LNG FSU order from DSME

 

Published by
LNG Industry,

GTT has received an order from the Korean shipyard Daewoo Shipbuilding & Marine Engineering (DSME) for the tank design of two floating LNG storage units (FSUs), the largest such units ever built.

The order has been placed by DSME on behalf of the Russian company GTLK.

Each FSU will have a capacity of 361 600 m3 and will be fitted with the NO96 GW membrane cryogenic containment system, a technology developed by GTT. Their delivery is scheduled for the end of 2022.

These two FSUs will be located respectively in the Murmansk region and in the Bay of Kamchatka in the Russian Federation. The will be employed in the Arctic LNG 2 project of the Russian LNG producer Novatek.

 

This article has been tagged under the following:

LNG project news Current LNG projects South Korea LNG news LNG news in Europe New-build LNG news