GTT has received an order for four large LNG carriers, to be built by the Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME).
The four LNG carriers for Maran Gas are expected to be delivered between 2017 and 2019 and will be built using NO96-GW technology, which allows an optimised boil-off rate of cargo LNG.
Philippe Berterottière, Chairman and CEO of GTT, commented: "We are very pleased that these new buildings for Maran Gas integrate GTT membrane technology. This order also reinforces our good relationship with DSME, a long term partner."
Adapted from press release by Katie Woodward