GTT has received, in 4Q25, an order from the shipyard Hanwha Ocean for the tank design of seven new LNG carriers on behalf of a European shipowner.
GTT will design the cryogenic tanks of the vessels, which will each offer a total capacity of 174 000 m3. The tanks will be fitted with the NO96 Super+ membrane containment system developed by GTT.
Delivery of the vessels is expected between 2028 – 2029.