ALE Heavylift has released a video showing the transportation of an LNG platform and transport frame at a project in Australia. The platform and transport frame weighed 350 t overall, with the platform measuring 46.2 m long, 23.3 m wide and 11 m high. It was transported by using 58 axle lines of SPMTs.