Micaela Piras, Civil Engineer, Techint Engineering and Construction, talks about her experience, which has led her to be a Mechanical Quantity Surveyor at the Dunkirk LNG Terminal construction site.
Ms Piras explains that flexibility, determination and precision are essential elements for her job.
The Dunkirk LNG terminal will have an annual regasification capacity of 13 billion m3 of gas.
As an LNG regasification infrastructure, the Dunkerque LNG terminal will be able to accommodate the world's largest LNG tankers in France, at the western outer harbour.
The Port of Dunkirk in France has issued an invitation for expressions of interest to create a small-scale marine and onshore LNG distribution station.