GTT has received an order notification from a Korean shipyard for the tank design of a new 174 000 m3 LNG carrier, to be built on behalf of a European ship-owner.
The vessel’s delivery is expected in Q1 2021.
The LNG tanks of the vessel will be equipped with the proven Mark III Flex containment system developed by GTT.
The ship-owner’s and shipyard's names are confidential.