GTT has received an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME), for the tank design of an LNG carrier with a capacity of 173 400 m3.
The unit is being built on behalf of a European ship-owner.
The tanks will be fitted with the NO96 GW technology and the vessel is expected to be delivered by end 2020.