Reuters are reporting that a total of 1.5 million t of LNG has been shipped from the Yamal LNG project so far.
The project’s first line, with an annual capacity of 5.5 million t, was launched last December.
The total capacity of Yamal LNG is seen at over 17 million tpy of LNG.